The Boxed Truck Crawler 180 kN is a ballasted and fully contained truck mounted CPT unit with a deployable set of crawlers, allowing it to test on sites that normal truck mounted units could not reach.
The Boxed Truck Crawler 180 kN carries forward Royal Eijkelkamp’s next generation design and features from the iconic Boxed Crawler 100 kN into a fully ballasted and roadgoing system.
The BTC 180 rig truly offers the best of both worlds. This truck mounted unit is able to drive to your project site without the need for a delivery vehicle; not only reducing mobilisation costs but also allowing for maximum project flexibility.
However, unlike conventional truck mounted units, the BTC 180’s deployable crawlers mean that it is able to traverse wet or boggy ground allowing it to test on sites that other trucks simply could not reach.
The fully ballasted rig is able to achieve high production rates thanks to its quick positioning between locations, efficient automatic levelling system and lack of a need to install any anchors. When in position, your operators work from a fully contained and well equipped cabin with an integrated 200 kN pusher, with hydraulic push/pull and catching clamps.
BTC 180 | |
---|---|
CPT tubes | (36/44 mm) up to 60 m |
Casings | (55 mm) up to 30 m |
Pushing force | 180 kN |
CPT stroke | 1250 mm |
Power CPT system | 24 VDC |
Weight | 17,600 kg |
Size (lxwxh) | approx. 8150 x 2500 x 4000 mm | 27 x 8 x 13 ft |
Need advice choosing the right product for your application? Our specialist Sven is happy to help.